Commissioning or recommissioning
Please refer to the user manuals of the hardware components for detailed commissioning instructions.
Consider the commissioning always as an operating status with special potential risks.
| CAUTION | |
|---|---|
Before electrically connecting the product, check the following points:
-
Check the conformity with the specification.
-
Check for damages.
-
Check the external energy supply and connections for conformity with the manufacturers’ specifications.
-
Check the function of the safety devices.
Take additional security measures for considering special risks during commissioning, in particular the following:
- Unauthorized people are not to use the machine.
- Keep persons away who are not instructed.
- Inform of potential risks.
Carry out operational checks:
-
Start with the safety devices.
-
After checking the safety devices, check single components.
-
After checking single components, check groups of components.
-
After checking groups of components, check the whole product.
-
Finally check the product under operating conditions.
Arrange the remedy of defects immediately.
Modifications works:
-
Obtain permission of the manufacturer.
-
Keep the modifications recorded.
System placement:
-
Keep the product away from cold sources, radiators, and heat sources.
-
Do not use the product in a humid environment.
